The complete ION solar lifecycle — Point of Sale to Permission to Operate — in four interactive layouts. Tap any node for detail, or run the guided walkthrough to trace a single project end to end.
Executive Linear Flow
Solar project, end to end — happy path with exception loops
▸ Design Resolution
▸ Approvals & Blockers
SPS needed?
Complete before / with install
↻ Failed Inspection
Failed
↻ Rejected PTO
Rejected
Swimlane Flow by Department
Who owns each step and where the handoffs happen
Status-Based Pipeline
Operational tracking — primary statuses, sub-statuses, and rework loops
Guided Walkthrough
Start here — step through one project and answer what happened